Source: 1xbet review websiteTime: 2024-02-27 17:32:02
1. Case name
Gucheng 1xbet.com login Mine Central Wind Shaft Free Air Oxidation Power Generation Project
2. Case background
Jinyuan Xingbian Fumin Company uses oxidation technology to destroy the drained gas and more than 70% of the exhausted air to generate electricity,Carbon 1xbet.com login reduction reaches 1 million tons。
3. 1xbet.com login implementation time
1xbet.com login start time: August 13, 2021
1xbet.com login completion time: November 10, 2022
Estimated service life of the 1xbet.com login: 12 years
4. 1xbet.com login partners
The project is implemented by Shanxi Lu’an Jinyuan Xingbian Fumin Coalbed 1xbet.com login Utilization Technology Co., Ltd.
5. Case pictures
6. Case results
Annual power generation 1.200 million KW·h,Carbon 1xbet.com login reduction reaches 1 million tons of carbon dioxide equivalent;
Gas utilization rate far exceeds that of internal combustion engine power generation,1xbet.com login destruction rate is over 99%;
The main equipment is all domestic equipment;
It has demonstration significance for ultra-low concentration gas 1xbet.com login reduction and comprehensive utilization。
7. Case link
/lahgjtdxal/lahgjtmkjwjpdxal/content_30790.html
Shanxi Lu’an Jinyuan Coalbed 1xbet.com login Development Co., Ltd.
February 27, 2024
Editor: Li Shichen
1xbet casino Houbao Town, Xiangyuan County, Changzhi City, Shanxi Province
Website content maintenance: Group News Center
Copyright : 2013-2021 Chinaluan.com All Rights Reserved Jin ICP No. 09009176